District first — Didwana-Kuchaman, Nawa tehsil पहले ज़िला — डीडवाना-कुचामन, नावां तहसील
Rajas is a village in Nawa tehsil of Didwana-Kuchaman district. The district was carved out of Nagaur in 2023 and was kept when Rajasthan cut back its new districts in December 2024; RIICO’s own lists put its Rajas industrial area under Didwana-Kuchaman. When you pull a jamabandi or a Bhu-Naksha map for land here, choose Didwana-Kuchaman and Nawa — older papers and brochures may still say Nagaur.
Rajas नावां तहसील, ज़िला डीडवाना-कुचामन का गाँव है। जमाबंदी या भू-नक्शा निकालते समय ज़िला डीडवाना-कुचामन और तहसील नावां चुनें — पुराने काग़ज़ों में नागौर लिखा हो सकता है।

Where Rajas sits Rajas कहाँ है
| Tehsil · district | Nawa tehsil · Didwana-Kuchaman district |
|---|---|
| Nearest town | Nawa, the tehsil town on the western side of Sambhar Lake |
| Rail | Nawa City is the town’s passenger station. The RDSO test track’s four stations are Gudha, Jabdinagar, Nawa and Mithri |
| Industry | RIICO’s Shri Ram Janki Industrial Area, Rajas — listed by RIICO; what is allotted or working there is not published |
| Records | Apna Khata · Bhu-Naksha — district Didwana-Kuchaman, tehsil Nawa |
| Cost context | Didwana-Kuchaman DLC on e-Panjiyan — see our DLC guide. AgriZameen does not publish DLC rates |
We do not print distances or travel times for Rajas: none of the figures circulating for it comes from a source we could check.
Claims you may hear about Rajas — checked Rajas के बारे में सुने जाने वाले दावे — जाँचे गए
A land-advisory flyer about Rajas reached us in October 2026 with six claims. We looked each one up. A claim is not a fact until its source is named — and none of these changes what a buyer has to check on the land itself.
| The claim | What the sources say | Status |
|---|---|---|
| “The Jaipur–Phalodi Thar Expressway touches Rajas’s boundary” | The expressway is real as an announcement: the Rajasthan budget of July 2024 lists Jaipur–Phalodi (345 km) among nine greenfield expressways, with project reports to be prepared. Its route is reported via Jobner, Bhatipura, Nawa, Kuchaman and Didwana. No published source names Rajas or any village on it, and we found no Section 3A notification. | Not confirmed |
| “Rajas to Jaipur in about 60 minutes” | A projection that depends on an expressway that is not notified, on its final route and on where its entry points are. No official source gives the figure. | Not published here |
| “SH-02 upgrade, Dudu–Bhatipura” | In the July 2024 budget: Dudu–Sambhar–Bhatipura (SH-02), 40.40 km. A tender for the Dudu–Bhatipura section was seen on a tender aggregator in April 2026. The 38.57 km length and an award date in the flyer were not found. | Announced · tender reported |
| “The RDSO high-speed test track — Jabdinagar station is part of Rajas” | The test track is real and close to finished: four stations — Gudha, Jabdinagar, Nawa and Mithri — with the high-speed stretch due in September 2026 and the curve loop in December 2026 (reported). We found no source that places Jabdinagar station in Rajas village. | Track confirmed “Part of Rajas” not confirmed |
| “Shri Ram Janki RIICO Industrial Area at Rajas” | Confirmed in RIICO’s own documents: its Direct Allotment Policy 2025 (S.No. 81, Didwana Kuchaman) and its March 2026 list of areas. How many plots are allotted or working is not published. | Confirmed — listed |
| “A 100 MW SJVN solar project adjacent to Rajas” | The project is confirmed by SJVN “at Nawa in District Didwana Kuchaman” — foundation stone 22 May 2025, scheduled commissioning 31 December 2025. No source names its village, so “adjacent to Rajas” is not confirmed; we found no announcement that it has been commissioned. | Project confirmed Location claim not confirmed |
छह दावों में से रीको का औद्योगिक क्षेत्र और टेस्ट ट्रैक पुष्ट हैं; सौर परियोजना नावां में पुष्ट है पर “Rajas के पास” नहीं; एक्सप्रेसवे घोषित है पर अधिसूचित नहीं; यात्रा-समय का दावा किसी आधिकारिक स्रोत में नहीं।
Development near Rajas — what is confirmed Rajas के पास विकास — क्या पुष्ट है
From our Belt Project Register. Each project sits on a five-rung ladder — announced, MoU, site identified, allotted, operating — because a project can be announced for years without a site. Nothing here is a price signal or a forecast. The whole register ›हर परियोजना पाँच सीढ़ियों में से एक पर है — घोषणा, MoU, स्थान, आवंटन, संचालन। यहाँ कोई क़ीमत या भविष्यवाणी नहीं है।
- SJVN 100 MW Nawa Solar Power Project4 · AllottedSJVN 100 मेगावाट नावां सौर ऊर्जा परियोजना · आवंटित
Status: Under construction — commissioning not yet announcedनिर्माणाधीन — चालू होने की घोषणा नहीं मिली
A 100 MW (AC) solar plant by SJVN Green Energy, which SJVN places “at Nawa in District Didwana Kuchaman”. The foundation stone was laid on 22 May 2025, and SJVN gave 31 December 2025 as the scheduled commissioning date. The construction contract was reported in January 2025. We found no announcement that it has been commissioned, and no source names the village it stands in.SJVN ग्रीन एनर्जी का 100 मेगावाट (AC) सौर संयंत्र, SJVN के अनुसार “नावां, ज़िला डीडवाना-कुचामन” में। शिलान्यास 22 मई 2025; SJVN की तय तिथि 31 दिसंबर 2025। चालू होने की घोषणा नहीं मिली; गाँव का नाम किसी स्रोत में नहीं।
SJVN press release; TaiyangNews · 23 May 2025; 30 January 2025 · last verified 2026-10-14
- RDSO high-speed railway test track (Gudha–Thathana Mithri)4 · AllottedRDSO हाई-स्पीड रेलवे टेस्ट ट्रैक (Gudha–Thathana Mithri) · आवंटित
Status: Under construction — first trials reported for late 2026निर्माणाधीन — पहले परीक्षण 2026 के अंत में बताए गए
A dedicated broad-gauge track for testing new trains and coaches, for Indian Railways’ research body RDSO, in the Jodhpur division, with four stations: Gudha, Jabdinagar, Nawa and Mithri. Reported at 59 km (Indian Infrastructure, August 2026) or 64 km (Rajasthan Patrika, August 2026), with a high-speed stretch and testing loops; the high-speed stretch was due in September 2026 and the Mithri curve loop in December 2026. It is a testing facility, not a new passenger line. Our guide: the Sambhar test track.नई रेलगाड़ियों के परीक्षण के लिए RDSO का समर्पित ब्रॉड-गेज ट्रैक, जोधपुर मंडल; चार स्टेशन — Gudha, Jabdinagar, नावां और Mithri। लंबाई 59 किमी या 64 किमी बताई गई। यह परीक्षण सुविधा है, नई यात्री लाइन नहीं।
Indian Infrastructure; Rajasthan Patrika; IANS · 25 August 2026; 3 August 2026; November 2024 · last verified 2026-10-14
- RIICO Shri Ram Janki Industrial Area, Rajas3 · Site identifiedरीको श्री राम जानकी औद्योगिक क्षेत्र (Rajas) · स्थान चिह्नित
Status: Listed by RIICO — what is allotted on the ground not publishedरीको की सूची में — ज़मीन पर आवंटन की जानकारी प्रकाशित नहीं
A RIICO industrial area at Rajas village (Nawa tehsil, Didwana-Kuchaman district). RIICO lists it (S.No. 81, Didwana Kuchaman) among the industrial areas of its Direct Allotment Policy 2025, which ran to 31 December 2025, and again in its March 2026 list of areas on 33-year leases. In January 2024 the Chief Minister named Rajas among new small industrial areas expected to start working soon. “Shri Ram Janki” is a name RIICO gives to several new areas across the state, not only this one. No published source says how many plots are allotted or occupied — ask RIICO before relying on it.Rajas गाँव (नावां तहसील, डीडवाना-कुचामन ज़िला) में रीको का औद्योगिक क्षेत्र। रीको की प्रत्यक्ष आवंटन नीति 2025 (क्रम 81) और मार्च 2026 की 33-वर्षीय लीज़ वाली सूची में दर्ज। कितने भूखंड आवंटित हैं, यह कहीं प्रकाशित नहीं — रीको से पूछें।
RIICO Direct Allotment Policy 2025; RIICO list of areas (March 2026); Deccan Herald · 2025 policy; March 2026; 22 January 2024 · last verified 2026-10-14
- Thar Expressway (Jaipur–Phalodi)1 · Announcedथार एक्सप्रेसवे (जयपुर–फलोदी) · घोषित
Status: Announced in the state budget — no land notification foundराज्य बजट में घोषित — कोई भूमि अधिसूचना नहीं मिली
345 km, one of nine greenfield expressways announced in the Rajasthan budget of July 2024, with detailed project reports to be prepared. Reported (Hindi press, October 2024) to run from Jaipur through Kalwar, Jobner, Bhatipura, Nawa, Kuchaman, Didwana and Nagaur to NH-11 at Phalodi. In November 2025 the Chief Minister was reported to have asked NHAI to take up land acquisition for the proposed greenfield expressways; only Jaipur–Pachpadra and Bikaner–Kotputli were reported as handed to NHAI. No Section 3A notification and no village-level alignment was found — no published source names a village on the route, Rajas included. The alignment is reported, not surveyed.345 किमी — जुलाई 2024 के राज्य बजट में घोषित नौ ग्रीनफ़ील्ड एक्सप्रेसवे में से एक, DPR बननी थी। रिपोर्ट के अनुसार मार्ग जयपुर, कालवाड़, जोबनेर, भाटीपुरा, नावां, कुचामन, डीडवाना, नागौर होते हुए फलोदी (NH-11) तक। कोई धारा 3A अधिसूचना या गाँव-स्तर का मार्ग नहीं मिला। मार्ग सर्वेक्षित नहीं, केवल रिपोर्ट किया गया है।
Rajasthan Budget 2024-25 (modified) speech, para 15; Rajasthan Patrika · 10 July 2024; 3 October 2024; 28 November 2025 · last verified 2026-10-14
AgriZameen is an independent private platform, not a government body, and is not affiliated with any company named here. Check every item with its source before you rely on it.AgriZameen एक स्वतंत्र निजी प्लेटफ़ॉर्म है — किसी सरकारी विभाग या यहाँ नामित किसी कंपनी से संबद्ध नहीं।
What this means if you are buying near Rajas Rajas के पास ज़मीन ख़रीदते समय
Sources स्रोत
- RIICO, Direct Allotment Policy – 2025, table of industrial areas, S.No. 81 “Didwana Kuchaman — Shri Ram Janki Industrial Area Rajas” (policy in force to 31 December 2025); RIICO list of areas under 33-year lease, March 2026.
- Deccan Herald, 22 January 2024 — the Chief Minister on new small industrial areas, Rajas among them.
- SJVN press release, 23 May 2025 — 100 MW Nawa Solar Power Project “at Nawa in District Didwana Kuchaman”, scheduled commissioning 31 December 2025.
- Indian Infrastructure, 25 August 2026 — RDSO test track, stations Gudha, Jabdinagar, Nawa and Mithri; Rajasthan Patrika, 3 August 2026.
- Government of Rajasthan, Modified Budget 2024-25 speech, 10 July 2024 — para 14 (Dudu–Sambhar–Bhatipura, SH-02, 40.40 km) and para 15 (Jaipur–Phalodi, 345 km).
- Rajasthan Patrika, 3 October 2024 (reported Thar Expressway route) and 28 November 2025 (land acquisition for greenfield expressways).
- All India Radio News, 28 December 2024 — Didwana-Kuchaman among the districts kept.
Nearby: Nawa · Sambhar · Phulera · Naraina · Didwana-Kuchaman in 2026 · The test track
Reviewed 14 October 2026. Project status, routes and notifications change; nothing on this page is a commitment, a price signal or a forecast. AgriZameen is an independent private platform, not a government body, and is not affiliated with RIICO, SJVN, RDSO, NHAI or any department. Verify every record on the official portal and at the Nawa tehsil and patwari office before any transaction. Nothing here is legal, tax or investment advice, and no return is assured.