संक्षेप में: रीको ने Rajas गाँव (नावां तहसील) में “श्री राम जानकी औद्योगिक क्षेत्र” को अपनी प्रत्यक्ष आवंटन नीति 2025 (क्रम 81) और मार्च 2026 की सूची में दर्ज किया है; कितने भूखंड आवंटित या चालू हैं, यह प्रकाशित नहीं। SJVN ग्रीन एनर्जी नावां में 100 मेगावाट सौर संयंत्र बना रही है — शिलान्यास 22 मई 2025, तय तिथि 31 दिसंबर 2025; चालू होने की घोषणा नहीं मिली। आसपास की कृषि भूमि का रिकॉर्ड इनसे नहीं बदलता।
The RIICO industrial area at Rajas Rajas में रीको औद्योगिक क्षेत्र
RIICO, Rajasthan’s industrial development corporation, lists the Shri Ram Janki Industrial Area at Rajas village — Nawa tehsil, Didwana-Kuchaman district — at S.No. 81 among the industrial areas of its Direct Allotment Policy 2025, which ran to 31 December 2025. It appears again in RIICO’s March 2026 list of areas on 33-year leases. In January 2024 the Chief Minister named Rajas among new small industrial areas expected to start working soon (Deccan Herald, 22 January 2024).
Two cautions. “Shri Ram Janki” is a name RIICO gives to several new areas across the state, so a document that says “Shri Ram Janki Industrial Area” without the village may be about another one. And no published source says how many plots at Rajas are allotted, built on or working: a listed area is not the same as a working one. Ask RIICO before you rely on either.
What an industrial area changes for land around it औद्योगिक क्षेत्र से आसपास की ज़मीन पर क्या असर
- InsidePlots inside the industrial area are allotted by RIICO under its own rules. Nobody else can sell you one.
- Next doorFarmland beside it stays agricultural land. An industrial area nearby does not convert it; any other use needs its own conversion.
- Before payingAsk the tehsil whether any acquisition notification covers the khasra — for an industrial area or for anything else — and read the jamabandi yourself.
SJVN’s 100 MW solar plant at Nawa नावां में SJVN का 100 मेगावाट सौर संयंत्र
SJVN Green Energy is building a 100 MW (AC) solar plant that SJVN places “at Nawa in District Didwana Kuchaman”. The construction contract was reported in January 2025 (TaiyangNews, 30 January 2025). The foundation stone was laid on 22 May 2025, and SJVN gave 31 December 2025 as the scheduled commissioning date (SJVN press release, 23 May 2025). As of 14 October 2026 we found no announcement that it has been commissioned, and no source that names the village it stands in.
What a solar plant means for land nearby सौर संयंत्र और आसपास की ज़मीन
- LocationWith no village named in any source, “adjacent to” any village is a claim to check, not a fact.
- Near the lakeLand near Sambhar Lake can carry wetland restrictions. In July 2026 the Rajasthan High Court let a solar project near the lake proceed on conditions — panels at least 1.5 m high, three trees planted for each one removed, and water inflow for birds kept open. We have not matched that project to SJVN’s plant. The rulings, explained.
- A lease offerIf anyone offers to lease your land for a solar project, it is a long contract over your land: read every clause with an advocate before you sign.
The claims, checked दावों की जाँच
A flyer about Rajas, sent to us in October 2026, named both projects. The industrial area is confirmed in RIICO’s own documents. The solar project is confirmed by SJVN, but not its location “adjacent to Rajas”. All six of the flyer’s claims are checked, with sources, on the Rajas village guide; the Thar Expressway named in it has its own status note.
Land near Rajas or Nawa?Send us the village and khasra. We check the jamabandi and the notifications, and tell you what we could not confirm.
WhatsApp +91 92502 13833Questions buyers ask अक्सर पूछे जाने वाले सवाल
Is there a RIICO industrial area at Rajas?
Yes. RIICO lists the Shri Ram Janki Industrial Area, Rajas (S.No. 81, Didwana Kuchaman) in its Direct Allotment Policy 2025 and again in its March 2026 list of areas. How many plots are allotted or working is not published; ask RIICO.
Can I buy a plot in the Rajas industrial area from a private seller?
Plots inside a RIICO industrial area are allotted by RIICO under its own rules. Ask RIICO directly, and do not pay anyone else for one.
Has SJVN’s Nawa solar plant been commissioned?
SJVN gave 31 December 2025 as its scheduled commissioning date. As of 14 October 2026 we found no announcement that it has been commissioned.
Is the SJVN solar plant next to Rajas?
SJVN places it “at Nawa in District Didwana Kuchaman”. No source we found names its village, so a claim that it is adjacent to Rajas, or to any village, is not confirmed.
AgriZameen एक स्वतंत्र निजी प्लेटफ़ॉर्म है — सरकारी संस्था नहीं, और यहाँ नामित किसी विभाग या कंपनी से संबद्ध नहीं। यह सामान्य जानकारी है, क़ानूनी सलाह नहीं, और कोई क़ीमत या रिटर्न का अनुमान नहीं। पैसा देने से पहले सरकारी रिकॉर्ड ख़ुद देखें और वकील से सलाह लें।